During 2016 Copper Lake completed a data base compilation of all historical exploration work on the Marshall Lake project area including drilling, surface sampling and geophysical VTEM, IP and magnetic surveys.
Copper Lake Interim CEO Terry MacDonald, stated “The existence of new gold mineralization identified during the recently completed compilation of historical data and which is now confirmed by the 2016 follow-up prospecting, mapping and channel sampling program, has greatly increased the gold and base metal potential and understanding on the Marshall Lake project.
The identification of strong folding of the stratigraphy and east plunging nature of fold structures within East-West trending structures has explained why some of the historical drilling has previously failed to test zones of mineralization and highlights the untested potential at several of these historical and the newly identified zones”.
For the full press release click here.