The helicopter-borne EM and magnetic geophysical survey will be flown using Geotech Ltd.’s VTEM plus time-domain system at a line spacing of 300m over 300 line kilometers in the northcentral region of the Preston project. The survey intends to define the extensions of prospective 2 conductive trends identified during previously completed surveys, similar in nature to those that host the high-grade Triple R and Arrow deposits located less than 25 kilometres to the north. Prior airborne surveys have delineated more than 360 linear kilometres of prospective EM conductors in 6 distinct uranium exploration corridors, out of which less than 10 kilometres have been investigated by widely-spaced diamond drilling. Surveying is anticipated to be completed during the first-half of November.
For the full press release please click here.