NexGen Intersects 56.5m at 11.55% U3O8 including 20.0m at 20.68% U3O8 in hole AR-15-44b

VANCOUVER, June 15, 2015 NexGen Energy Ltd. (TSX-V: NXE) (“NexGen” or the “Company”) is pleased to report assay results for angled  hole AR-15-44b from the successful winter 2015 program at the Arrow zone on our 100% owned Rook I property, Athabasca Basin, Saskatchewan

AR-15-44b has delivered one of the finest uranium mineralized intersections ever drilled in the Athabasca Basin, and is the most continuously mineralized intersection of any hole drilled at the Arrow zone to date. Assays are presented in Table 1, a plan map of the Arrow zone is shown in Figure 1, long sections of the A2 and A3 high grade core zones are shown in Figure 2 and Figure 3, respectively.

For the full news story click here.

Category: News Story

You Might Also Be Interested In

Bayhorse Silver Receives Two Silver Exploration Targets From Additional Magnetic Survey Analysis On Its Bayhorse Properties.

Bayhorse Silver Inc, has received from Geotech its magnetic structural interpretations and structural complexity analysis of its recent survey from the Bayhorse Idaho/Oregon Geophysics Project area.

Category: News Story