Airborne EM Survey Confirms Multiple VMS Targets at Collerina
Helix Resources (ASX:HLX) is pleased to advise that a 600 line‐kilometre VTEM‐Max helicopter‐borne geophysical survey has been completed …
Helix Resources (ASX:HLX) is pleased to advise that a 600 line‐kilometre VTEM‐Max helicopter‐borne geophysical survey has been completed …
For the full press release please click here.
The gravity surveys will cover approximately 13.8 km of the 94.0 km of primary structural corridors that were …
Ralph Fitch, President and CEO of the Company stated “These latest results from South Jumbo are very important …
KINSLEY PROJECT UPDATE A helicopter-borne MAG-VTEM survey has been completed over the 10 km2 Kinsley Project, in order …
Mark Kolebaba President and CEO of Adamera states “The Geotech Ltd. survey was designed to identify electromagnetic conductors …
At Detour West, located 180 kilometres northeast of Timmins, Ontario and 20 kilometres west of the Detour Lake …
2016 VTEM Airborne Survey The VTEM survey consisted of 854 line kilometres, flown at 200 metre spacing over …
Orebodies recently completed an airborne VTEM geophysical survey over the entire North Limb Property, for which the Company …
The Survey identified a total of 94 km of primary northeast-southwest oriented structural corridors (Figure 1, black lines), …