Skyharbour Commences Airborne Geophysical Program at Preston Uranium Project in the Athabasca Basin, Saskatchewan

Vancouver, BC – Skyharbour Resources Ltd. (TSX-V: SYH) (OTC Grey: SYHBF) (Frankfurt: SC1N) (the “Company”) is pleased to announce it has commenced a field program, in conjunction with project partner Clean Commodities Corp., consisting of an airborne electromagnetic (EM) and magnetic survey on the Preston Uranium Project, which is one of the largest tenure positions in the Patterson Lake (PLS) area totalling over 121,249 hectares (nearly 300,000 acres). The Preston Uranium Project is a strategic, district-scale tenure position located near NexGen Energy Ltd.’s high grade Arrow deposit hosted on its’ Rook-1 property and Fission Uranium Corp.’s Triple R deposit located within their PLS Project area.

The helicopter-borne EM and magnetic geophysical survey will be flown using Geotech Ltd.’s VTEM plus time-domain system at a line spacing of 300m over 300 line kilometers in the north-central region of the Preston project. The survey intends to define the extensions of prospective conductive trends identified during previously completed surveys, similar in nature to those that host the high-grade Triple R and Arrow deposits located less than 25 kilometres to the north.

For the full press release please click here.

Category: News Story

You Might Also Be Interested In